Cudahy, CA
Storm damage roofing in Cudahy
The first hour after a storm is about stopping water, not about getting the best price. Those are two separate jobs and they happen in that order.
Describe the storm damage job
Three questions, then the address. Up to three Cudahy contractors who do this work.
You are on the list.
No provider in Cudahy is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a storm damage job. A contractor who has not raised them has not looked properly.
- A local address you could actually drive to
- Photographs of the damage before any work happens
- A written scope of the work, line by line
- Whether the contractor is licensed and insured in this state
- What the emergency tarp costs, separate from the repair
A local contractor who inspects and documents properly is more use to you than a fast one who is already on the roof.
Do not sign anything on the doorstep. Read any contract twice before you sign it; most home improvement contracts in California can be cancelled within three business days.
Keep every receipt, including the tarp and the emergency call-out. They are part of the record of what happened and what it cost.
Locally
Close behind that: shaded slopes that never really dry out. Damp that arrives every morning and leaves by lunchtime is worse for a roof than rain, because nothing ever fully dries between one and the next.
About storm damage here
What warranty should I expect?
Two separate things. The manufacturer covers the material for its rated life, but only if it was installed to their specification. The contractor covers workmanship, commonly five to ten years, and only for as long as they are trading.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Should I repair or replace?
It depends almost entirely on how much life is left in the material. Ask any contractor who inspects it to give you a number of years and a reason. If two of them independently say the same thing, believe it.
It is leaking right now. What do I do?
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
Get the roof looked at
Free, no obligation, and your details go to no company until you say yes.
